Investment project — Post state

Mobile Enterprise Drone Command Center.

An integrated mobile platform comprising equipped vehicles, professional drones (SAPR), a real-time control room, robotic maintenance, and autonomous energy and communication infrastructure. The goal: to deliver a documented and measurable reduction in occupational injury and illness risks by replacing direct exposure with supervised remote operations.

10
integrated subsystems
−95%
height access
R=16→2
fall risk reduction
24/7
mobile control room
4.1 · Summary

From physical presence to remote control.

The project involves building an integrated mobile enterprise platform: equipped vehicles, drones (SAPR), a mobile control room with real-time command and control, robotic maintenance, and autonomous energy/communication infrastructure.

The primary objective is the documented and measurable reduction of the occupational injury and illness risks identified in the pre-intervention analysis, through the systematic replacement of direct in-person activities with remote, automated operations supervised from a control station.

4.2 · Components

Integrated system.

Six operational subsystems combined into a single mobile architecture: inspection and agricultural drones, control room, off-road logistics, green-space robotics and PV cleaning.

SAPR Inspection

DJI Matrice 4T

Multi-sensor enterprise drone

IR thermal camera 640×512 (NETD <30mK), 48MP visual sensor, laser rangefinder and environmental sensors. Aerial thermography, structural video inspections and real-time perimeter surveillance.

  • PV thermography: hotspots, faulty cells, anomalies
  • Video inspections of roofs and industrial structures
  • Live-streamed perimeter surveillance of work sites
Safety impact

R1 fall from height: R=16 → R=2. R2 thermal exposure: R=9 → R=2.

SAPR Agricultural

DJI Agras T100

Heavy-lift liquid distribution

50 L tank, coverage up to 21 hectares/hour, centimetre-level RTK, programmable autonomous routes for crop protection treatments and targeted irrigation.

  • Aerial distribution without operator exposure
  • Centimetre-level RTK navigation
  • Autonomous flight on pre-programmed routes
Safety impact

R4 chemical/biological agents: R=6 → R=1. Positive effect on R5 vibration.

Control Room

Iveco Daily H3 L4

Mobile workshop and command centre

Multi-monitor workstation, local NAS/server, drone charging station, Starlink connectivity, PV roof with storage and backup generator, ergonomic workstation.

  • Simultaneous management of SAPR feeds
  • Starlink: satellite broadband anywhere
  • Energy self-sufficiency via PV + storage + genset
Safety impact

R7 operational isolation resolved: constant communication with headquarters and emergency services.

Logistics

Ford Ranger Raptor 4x4

Off-road operational vehicle

Off-road vehicle for remote sites and unpaved terrain, professional winch for recovery, equipment transport and safety in adverse environmental conditions.

  • Access to remote industrial and agricultural sites
  • Winch and professional recovery kit
  • Safe transport of technical instrumentation
Safety impact

Reduced response times and risks from difficult terrain.

Green Robotics

Remote-controlled mower

Remote mowing on slopes up to 55°

Remote-controlled green maintenance machine, operating on uneven terrain and beneath PV modules. The operator controls the vehicle from a safe distance.

  • No direct contact with cutting elements
  • Works beneath PV strings without dismantling
  • Eliminates exposure to debris and biological agents
Safety impact

Eliminates mechanical risks from cutting, vibration and biological agents.

PV Cleaning

Module cleaning system

Extendable arms and SAPR support

Cleaning of photovoltaic modules without manual roof access, using demineralised water distributed via extendable arms or aerial dispensers.

  • Zero personnel at height for cleaning
  • Demineralised water for maximum performance
  • Programmed seasonal cycles
Safety impact

Eliminates residual R1 risk during routine maintenance operations.

Risk matrix

Before and after the project.

Documented reduction of the main risks identified in the pre-intervention state, measured as Probability × Harm according to the risk assessment matrix.

CodeRiskBeforeAfterΔ
R1Fall from height16288%
R2Thermal exposure9278%
R4Chemical/biological agents6183%
R5Mechanical vibration6267%
R7Operational isolation8188%
Want to know more?

Request the full technical datasheet.

Full documentation of the investment project, including before/after risk analysis, details of all 10 subsystems and the operational timeline.

Contact the team